Real facilities. Documented results.
Every Servitek engagement produces measurable outcomes. Explore the numbers, the engineering decisions, and the long-term impact.
48% cooling energy cut for a 22MW hyperscale campus
Redesigned chilled water plant with free-cooling loop, adaptive pump controls, and containment retrofits.
HEPA-grade air quality across 620 patient rooms
Full AHU replacement with H14 filtration, room-level pressure control, and BMS integration.
Paint booth VOC control with 60% heat recovery
Custom exhaust system with regenerative thermal oxidizer and heat recovery integration.
GMP cleanroom for oncology drug production
Grade B/C cleanroom suite with dedicated AHUs, HEPA H14, and validated commissioning package.
Luxury resort with silent-operation VRF
525-key resort with room-level occupancy sensing and heat-recovery VRF across all zones.
Net-zero-ready secondary school campus
Displacement ventilation, DOAS, and geothermal integration for 1,800-student campus.